I called Winchester Public Works and they estimate that it will be done by the end of November. It is a much simpler bridge than usual. The bridge is about 400ft east of the Lake Winchester entrance.
When I was there, I parked my car and walked my kayak 400ft instead of driving miles around to the other side.